Project: COSCP – Christ Our Savior Catholic Parish
Info
-
Category: Structural Concrete
-
Project Execution Time: Jan 2020 – Apr 2019 (4 Months)
-
Trade Self Performed: Concrete Forming, Rebars Installation, Moment Frame Bolts Installation, Build Footings, Strips & main Slab, Pouring Concrete
-
Location: 2000 W. Alton Ave. Santa Ana, CA 92704
-
Size: 25,000 SQFT
-
Owner: Diocese of Orange
-
Foundation Type: Concrete MAT Slab