Christ Our Savior Catholic Parish
Structural Concrete
Project: COSCP – Christ Our Savior Catholic Parish
Info
Category: Structural Concrete
Project Execution Time: Jan 2020 – Apr 2019 (4 Months)
Trade Self Performed: Concrete Forming, Rebars Installation, Moment Frame Bolts Installation, Build Footings, Strips & main Slab, Pouring Concrete
Location: 2000 W. Alton Ave. Santa Ana, CA 92704
Size: 25,000 SQFT
Owner: Diocese of Orange
Foundation Type: Concrete MAT Slab
Other Projects
- Show All
- ASPHALT PAVING
- DRYWALL
- EXCAVATION
- LATH & PLASTER
- METAL STUD FRAMING
- PIPING
- ROUGH CARPENTRY
- SOIL REMEDIATION
- STRUCTURAL CONCRETE
- STRUCTURAL FRAMING
- TENANT IMPROVEMENT
- VAPOR EXTRACTION
{"pages":5,"paged":1,"class":"portfolio-pagination","type":"custom","url":"https:\/\/sunpeak.com\/portfolio\/structural-concrete-church-construction\/"}
Comments are closed